|
|
 |
|
|
|
Preparation for The Design Code begins |
|
|
|
The Design Code is being prepared by the design team in conjunction with the ongoing stage of consultation feedback from local authority officer and ... |
|
|
|
 |
|
|
|
|
| you are here: |
|
Home
>
Events
|
|
|
|
The Project Team evolved the scheme and continues to consult through monthly meetings with stakeholders. These include a Partnership Meeting with key local authority officers and key members of the Consultant Team and the Applicant; Design Team Meetings, and meetings with Applicant and key local authority officers. The Client and Consultant Team have also met on a monthly basis with more topic specific meetings when required.
 |
|
|
|
| 19/02/2008 Design Workshop feedback session |
|
| Pontefract Town Hall |
|
| To feedback and update on the developments that have taken place since the last design workshop. |
|
Further info if needed:
- Questions and comments raised from the previous design workshop
- Comments raised on the interactive walk with local residents
- Proposed Northern Road design options
- Phasing drawings for the construction of the scheme
- Concept masterplan including public open space
click here to download Design Workshop feedback session powerpoint (.ppt) |
|
|
|
 |
|